Footing Silo Cement Storage for Concrete Roof Tile Project (2015)
- Install Rebar footing
- Stump Column
- Form work footing(ply wood 12cm + tube 50x50x1.5)
- Cover rebar 50mm.
Prepare for Casting concrete Ground Floor level (Roof Tile Project 2015)
- Installation Formwork
- Installation Rebar Slab ( follow up drawing design )
- keep Spacing rebar the design
- Site clearing, remove rubbish, wood, stumps, debris , tree grass...
- Protection Steel structure for column from concrete during pouring by PVC plastic sheet cover.
Foundation Work
- Soil Excavation, Checking level footing
- Make Slope follow drawing
- Making line for Pile Cut off
- Keep Starter bar inside pile for Anchor into pile cap
- Keep Length of starter bar must be enough follow specification
- Preparing Lean concrete
- Installation Formwork Pile Cap
- Reabr pile cap
- Stump Colunm
- Casting concrete
- Site Preparation , make handrail or Barricade around working area
- Make access road working inside building
No comments:
Post a Comment